OutriggerC

ontrolS

witches

(F

igur

e1

4)

The

le

ft

and

right

outrigg

erco

ntrol

swi

tches

rai

seor

lower

the

cor

res

pondin

gou

trig

gers

.T

he

roc

ker

swi

tches

are

spr

ing

loade

dt

or

etur

nt

o

the

cent

er(

sto

p)pos

itio

nw

hen

rel

eased

.

Rais

eL

eftO

utr

igger

...........

.pr

ess

top

of

le

ft

sid

es

witc

h

Lo

we

rL

eft

Out

rigg

er....

.......

pre

ss

bo

ttom

of

le

fts

ides

witc

h

Rais

eR

igh

tO

utrigge

r.

.......

..p

re

ss

to

pof

rig

hts

ide

swi

tch

Lo

wer

Right

Outr

igger

........

..p

re

ss

bottom

ofr

ight

side

swi

tch

Figure

14

NOTE:Ou

trigg

erpos

itio

ni

sc

riti

cal

to

allo

wful

lex

tensio

no

ft

heboo

m.

Refer

to“

Under

stan

ding

the

Boom

/Outr

igger

Inter

lock

Sys

tem”on

page

66

for

ade

tailed

expl

anatio

nof

theint

erloc

k.

OH04

20

OH170

0

Right

Side

Ou

trigger

Switch

Left

Side

Ou

trigger

Switch

Operation

33

Model 10054

Rev 3/02

Outrigger Control Switches

(Figure 14)

The left and right outrigger control switches raise or lower the
corresponding outriggers. The rocker switches are spring loaded to return to
the center (stop) position when released.

Raise Left Outrigger............ press top of left side switch

Lower Left Outrigger ........... press bottom of left side switch

Raise Right Outrigger ..........press top of right side switch

Lower Right Outrigger..........press bottom of right side switch

Figure 14

NOTE: Outrigger position is critical to allow full extension of the boom.
Refer to “Understanding the Boom/Outrigger Interlock System” on page 66
for a detailed explanation of the interlock.