 3UHSDUDWLRQ DQG &DUU\LQJ 2XW 0HDVXUHPHQWV

IKA

-WERKE C 7000

Ver. 07 09.07

6HLWH 

g

Close the decomposition vessel C 7010 oder C 7012

Place the cover onto the lower section and push down until it presses against the

stop piece in the lower section.

C 7010/ C 7012

Place the union nut onto the lower section and tighten by hand.

The decomposition vessel can now be filled.

h

Finally, the decomposition vessel is filled with oxygen at 30 bar using the C 48 IKA

oxygen filling station. Follow the operating instructions for the C 48 oxygen filling

station.

7KH R[\JHQ SUHVVXUH VKRXOG EH  EDU DQG PXVW QRW H[FHHG  EDU 8VH TXDO

LW\  R[\JHQ  SXUH R[\JHQ 

Following preparation of the decomposition vessel, it will be subjected to either a

calibration or a calorific value determination. The two procedures are very similar, so

that they are described together below. Where there are differences these will be

explained.

When the decomposition vessel has been prepared, a calibration or a calorific value

determination is prepared by carrying out the following steps: