Resistance measurement, Continuity measurement, Resistance measurement -2 – JLG 660SJ Service Manual User Manual

Page 302: Continuity measurement -2

Advertising
background image

SECTION 7 - BASIC ELECTRICAL INFORMATION & SCHEMATICS

7-2

– JLG Lift –

3121298

Resistance Measurement

• First test meter and leads by touching leads together.

Resistance should read a short circuit (very low resis-
tance)

• Circuit power must be turned OFF before testing resis-

tance

• Disconnect component from circuit before testing

• If meter is not auto ranging, set it to the correct range

(See multimeter’s operation manual)

• Use firm contact with meter leads

Continuity Measurement

• Some meters require a separate button press to enable

audible continuity testing

• Circuit power must be turned OFF before testing conti-

nuity

• Disconnect component from circuit before testing

• Use firm contact with meter leads

• First test meter and leads by touching leads together.

Meter should produce an audible alarm, indicating
continuity

Figure 7-2. Resistance Measurement

Figure 7-3. Continuity Measurement

Advertising
This manual is related to the following products: