Hub-spindle disassembly, Hub-spindle disassembly -6, Hub spindle disassembly -6 – JLG 660SJ Service Manual User Manual

Page 50

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3-6

– JLG Lift –

3121298

Hub-Spindle Disassembly

1.

Place unit on bench with Spindle (1A) end down.

2.

Remove 2 Set Screws (1G) and Bearing Nut (1F) using T-
206569.

NOTE:

Holes in Bearing Nut (1F) for Set Screws (1G) are staked for
retention of Set Screws (1G). Clean holes before removing
Set Screws.

3.

Remove “A” position Bearing Cone (1C) from Bearing
Cup (1C) in Hub (1D).

4.

While supporting unit on Hub (1D) flange, press Spindle
(1A) out of Hub (1D).

5.

Lift Hub (1D) off of Spindle (1A). Remove Boot Seal (1Q)
from Hub (1D) if applicable.

6.

If necessary, press nine Studs (1H) out of Hub (1D).
Locate Hub (1D) on Seal (1B) end.

7.

Remove Seal (1B) from Hub (1D). Discard seal.

8.

Remove “B” position Bearing Cone (1C) from Bearing
Cup (1C) in Hub (1D).

9.

Remove “B” position Bearing Cone (1C) from Hub (1D).

10.

Using a soft steel rod, knock both Bearing Cups (1C) out
of Hub (1D).

Figure 3-7. Hub Spindle Disassembly

1A

1B

1C

1H

1D

1C

1F

1G

Advertising
This manual is related to the following products: