3 engine operation, Starting procedure, Engine operation -4 – JLG 600SC_660SJC Operator Manual User Manual

Page 56: Starting procedure -4

Advertising
background image

SECTION 4 - MACHINE OPERATION

4-4

– JLG Lift –

3121606

4.3

ENGINE OPERATION

NOTE:

Initial starting should always be performed
from the Ground Control station.

Starting Procedure

IF ENGINE FAILS TO START PROMPTLY, DO NOT CRANK FOR AN EXTENDED PERIOD.
SHOULD ENGINE FAIL TO START ONCE AGAIN, ALLOW STARTER TO “COOL OFF” FOR 2-3
MINUTES. IF ENGINE FAILS AFTER SEVERAL ATTEMPTS, REFER TO ENGINE MAINTE-
NANCE MANUAL.

NOTE:

After turning on ignition, operator must wait until
glow plug indicator light goes out before cranking
engine.

1.

Turn key of Platform/Ground Select switch to
Ground.

2.

Pull the Power/Emergency Stop switch to On.

3.

Push the Engine Start switch until engine
starts.

ALLOW ENGINE TO WARM-UP FOR A FEW MINUTES AT LOW SPEED BEFORE APPLYING
ANY LOAD.

4.

After engine has had sufficient time to warm
up, push in the Power/Emergency Stop switch
and shut engine off.

5.

Turn Platform/Ground Select switch to Plat-
form.

6.

From Platform, pull Power/Emergency Stop
switch out.

Advertising