General -8, Daily walk-around inspection (sheet 2 of 4) -8, General – JLG 800A_AJ Operator Manual User Manual

Page 28

Advertising
background image

SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION

2-8

– JLG Lift –

3121209

GENERAL

Begin the "Walk-Around Inspection" at Item 1, as noted on the
diagram. Continue to the right (counterclockwise viewed from
top) checking each item in sequence for the conditions listed
in the following checklist.

TO AVOID POSSIBLE INJURY, BE SURE MACHINE POWER IS OFF.

DO NOT OPERATE MACHINE UNTIL ALL MALFUNCTIONS HAVE BEEN
CORRECTED.

INSPECTION NOTE: On all components, make sure there are
no loose or missing parts, that they are securely fastened, and
no visible damage, leaks or excessive wear exists in addition to
any other criteria mentioned.

1. Platform Assembly - Platform Assembly and Gate -

Footswitch works properly, not modified, disabled or
blocked. Latch, stop, and hinges in working condition.

2. Platform Control Console - Switches and levers return

to neutral, decals/placards secure and legible, control
markings legible.

3. Rotator - See Inspection Note.

4. Rotator Motion Control Valve - See Inspection Note.

5. Articulating Jib Boom - See Inspection Note.

6. Dual Capacity Limit Switch (ANSI, Australia, if

equipped); Transport Position Limit Switch (CE) -
Properly secured, no damage to the switch, arm free
to move, and free from dirt and grease.

7. Power Track - See Inspection Note.

8. Steer Cylinder Assembly - See Inspection Note. (4

Wheel Steer if equipped)

9. Spindle - See Inspection Note. (4 Wheel Steer if

equipped)

10. Drive Motor and Brake - See Inspection Note.

11. Drive Hub - See Inspection Note.

12. Wheel/Tire Assembly - No loose or missing lug nuts,

proper inflation (pneumatic). Inspect for worn tread, cuts,
tears or other discrepancies. Inspect wheels for damage
and corrosion.

Figure 2-4. Daily Walk-Around Inspection (Sheet 2 of 4)

Advertising