SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION

2-16

– JLG Lift –

3121209

NOTE: Footswitch has a 7 second delay timer. If a function is not

activated within 7 seconds after depressing the foot-
switch, reset the footswitch.

3. Ensure that all machine functions are disabled when the

Emergency Stop Button is activated.

4. Check auxiliary power for proper operation. Operate

each function control switch to ensure proper operation
of the auxiliary power system.

NOTE: Step 5 is only applicable for 800A ANSI market machines.

5. If equipped with a dual capacity system, check the limit

switch as follows:

a. On a level surface with less than 500 lb (227 kg) in

the platform, raise tower base boom to maximum
angle keeping main boom horizontal.

b. Extend the main fly boom until the capacity indica-

tor lights change from 1000 lb. (454 kg) to 500 lb.
(227 kg).

c. With main boom in this position, raise the main

base boom until the capacity indicator lights
change back to the 1000 lb. (454 kg) indicator.

DISCONTINUE OPERATION IF THE CAPACITY INDICATOR SYSTEM
DOES NOT OPERATE PROPERLY.

6. Drive forward and reverse; check for proper operation.

7. Steer left and right; check for proper operation.

8. Check the high-engine cutout for the tower boom

assembly as follows:

a. Place machine on level surface with booms

retracted and lowered.

b. From the platform control, position DRIVE SPEED/

TORQUE SELECT switch to FAST (Forward Posi-
tion).

c. Using extreme caution, partially position the DRIVE

control to FORWARD just enough to obtain high
engine but not enough to cause the machine to
move.

d. Raise the TOWER BASE BOOM until the engine

speed shifts from high speed to mid speed. The
bottom of the upright should NOT be above the
hood level of the machine.