Installation of the boom assembly, 2 wear pads, Installation of the boom assembly -5 – JLG E300 Service Manual User Manual

Page 91: Wear pads -5

Advertising
background image

SECTION 4 - BOOM & PLATFORM

3120772

– JLG Lift –

4-5

Installation of the Boom Assembly

1.

Using suitable lifting equipment, position boom
assembly on turntable so that boom pivot holes in
both boom and turntable are aligned.

2.

Install boom pivot pin, ensuring that location of the
hole in pivot pin aligns with attach point on upright.

3.

Using all applicable safety precautions, operate lift-
ing equipment in order to position boom lift cylinder
and level link so that holes in cylinder rod end and
level link are aligned with the one in the turntable.
Insert cylinder pins.

4.

If necessary, gently tap pins into position with a soft
headed mallet, ensuring that attach holes in pins are
aligned with attach holes in boom structure. Secure
with hardware.

5.

Connect all hosing and wiring.

6.

Install the platform, and jib if applicable, to the boom
assembly.

7.

Connect all hosing and wiring at platform control
station.

8.

Using all safety precautions, operate machine sys-
tems and extend and retract boom for four or five
cycles.

9.

Shut down machine systems and check for leakage.

4.2 WEAR PADS

1.

Shim up wear pads until snug to adjacent surface.

2.

Bolt into threaded insert of wear pad.

3.

Replace wear pads when worn to thickness of 9/16”.

Figure 4-3. Location of wear Pads

Advertising