12 swing hub installation, Swing hub installation -49, Swing torque hub adjustment -49 – JLG 800A_AJ Service Manual User Manual

Page 105

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3120858

– JLG Lift –

3-49

3.12 SWING HUB INSTALLATION

1. Ensure mounting plate and mounting location of the

base plate are clean and painted with a uniform
coating of minimum thickness. (no runs, drips, etc.)

2. Assemble mounting plate, hub, brake, and motor.
3. Torque Items #1 to 120 ft. lbs.(17kgm)(w/#242 Loc-

tite)

4. Torque Items #2 to 285 ft. lbs.(40kgm)(w/#171 Loc-

tite)

5. Position swing drive to approx. location of bearing

gear max. eccentric tooth. (high spot)

6. With bearing free to slide, shim between pinion gear

and the bearing teeth to +0.008" / +0.012"
(+0.20mm/+0.30mm)backlash.

7. Alternately torque setscrews, item #4 to 30 ft. lbs.

(42 Nm), run jam nut tight against the 1" block.

8. Torque item #3 to 165 ft. lbs.(23 kgm)(w/ hardened

washers and #271Loctite).

Figure 3-38. Swing Torque Hub Adjustment

Advertising