Display unit -45 – JLG 800A_AJ Service Manual User Manual

Page 259

Advertising
background image

SECTION 4 - BOOM & PLATFORM

3120858

– JLG Lift –

4-45

4.15 LOAD SENSING SYSTEM MACHINES

BUILT TO S/N 0300062045

DO NOT PLACE LOADS IN THE PLATFORM TO CAUSE AN OVER-
LOAD. IF AN OVERLOAD CONDITION IS REACHED, IMMEDIATELY
STOP OPERATION, REMOVE EXCESS LOAD, AND RETRACT THE
UPPER BOOM AND LOWER THE PLATFORM TO THE GROUND.
NO FUNCTIO NS ARE CUT OUT BY THIS SYSTEM. IF THE
MACHINE IS OVERLOADED, HAVE THE MACHINE INSPECTED BY

A QUALIFIED PERSON BEFORE RESUMING OPERATION. FAIL-
URE TO FOLLOW THESE INSTRUCTIONS COULD RESULT IN
DEATH OR SERIOUS INJURY.

The Load Sensing System consists of load cells mounted
beneath the platform and a display unit mounted on the
platform next to the control console. The system acts as a
load sensing device which sounds a warning when an
overload condition is being reached or when an overload
condition is occurring. The Load Sensing System only
operates when the platform control console is powered.

GREEN

PROPER LOAD

INDICATOR

RED

OVERLOAD

INDICATOR

TEST

BUTTON

AUDIO

ALARM

YELLOW

APPROACHING OVERLOAD

INDICATOR

Figure 4-23. Display Unit

Advertising