Calibration - ade equipped machines – JLG 800A_AJ Service Manual User Manual

Page 267

Advertising
background image

SECTION 4 - BOOM & PLATFORM

3120858

– JLG Lift –

4-53

Calibration - ADE Equipped Machines

1. Connect the JLG Hand-held analyzer to the original

analyzer connection in the ground box.

DO NOT CONNECT TO THE ANALYZER CONNECTION PORT
INSTALLED WITH THE UPRIGHT MONITORING SYSTEM MODULE.

2. Pull out the emergency stop button at the ground

control station and start the engine from the ground
controls.

3. To calibrate the Upright Monitoring System through

the hand-held analyzer, you must be in access level
1. To advance to access level 1, scroll to the

ACCESS LEVEL menu and press "ENTER"

.

Using the arrows on the keypad, enter the password

"33271" and press "ENTER"

.

4. Calibrate the upright monitoring system sensor by

the following procedure:

a. In access level 1, scroll through the menu items

until "CALIBRATIONS" is displayed on the sec-
ond line of the analyzer screen. The screen will
display the following:

b. After pressing 'ENTER"

one of the following

screens will be displayed:

Or:

c. Scroll left to right through the above menu items

until "UMS SENSOR" sub menu appears on the
bottom line of the analyzer display. Press the

"ENTER"

key.

Advertising