Mechanical installation – Lenze E94AZPP User Manual

Page 44

Advertising
background image

Mechanical installation

Arrangement of the devices

4

l

44

EDK94ZPP0364 DE/EN/FR/ES/IT 2.1

A DC−bus connection with regenerative power supply module has to be planned
and dimensioned taking the technical data into account.
How to arrange the devices for operation in the DC−bus connection via the DC
busbars:

ƒ

Arrange the devices in a row from left to right.

ƒ

Install the supplying device on the left:

Regenerative power supply module with assigned mains filter (in a first
row),

Input module (in the following rows).

ƒ

Install the multi drive axis controllers to the right from the highest to the
lowest power (recommendation).

ƒ

For increasing the braking power also single drive axis controllers can be
integrated. For this purpose, these axis controllers have to be equipped
with the optional busbar mounting set (E94AZJAxxx). In order to carry out
multi−supply applications, consult Lenze.

Advertising