3 mounting steps, Mechanical installation – Lenze E94AZPP User Manual
Page 45
Advertising
![background image](/manuals/565815/45/background.png)
Mechanical installation
Mounting steps
l
45
EDK94ZPP0364 DE/EN/FR/ES/IT 2.1
4.3
Mounting steps
Proceed as follows for the installation:
1. Prepare M5 threaded holes on the mounting plate according to the
mounting grid.
2. Screw the installation backplane onto the mounting plate. Do not yet
tighten the screws.
–
Use M5 screw and washer assemblies or M5 hexagon socket screws
with washers.
–
The screw joint in the installation backplane may not jut out more than
7 mm.
3. Repeat step 2 for other installation backplanes, which can be mounted
directly adjacent to one another.
4. Align all installation backplanes.
5. If busbars are used: connect the busbars.
6. Tightly screw all installation backplanes onto the mounting plate.
–
Tightening torque: 3.4 Nm (30 lb−in).
Advertising