4 commissioning, Before switching on, Commissioning 56 – Lenze E82ZAFVC010 User Manual
Page 56
Advertising
![background image](/manuals/565930/56/background.png)
4
Commissioning
Before switching on
EDK82ZAFVC010 DE/EN/FR 2.0
56
l
H1inbet−reihenfolge einhalten
4
Commissioning
Before switching on
(
Stop!
Before you switch on the basic device with the communication module for the
first time, check
ƒ
the entire wiring for completeness, short circuit and earth fault.
ƒ
whether the bus system is terminated by terminating resistors at the first
and last bus device.