Please observe the following for wiring according to EMC guidelines:

Note!

ƒ

Separate control cables from motor cables.

ƒ

Lead the shields as far as possible to the terminals (unshielded core length

< 40 mm).

ƒ

Connect control and data cable shields as follows:

Analog signal cable shields must be connected with one end at the

inverter.

Digital signal cable shields must be connected with both ends.

ƒ

More information about wiring according to EMC guidelines can be

obtained from the corresponding documentation for the standard device.

How to connect the shield

c

d

e

8200mot045/046/047

1. Prepare cable.
2. Insert cable tie into shield sheet.
3. Insert cable and tighten cable tie. Shield and shield sheet must be tightly connected.