7 commissioning, Before switching on, Switch position – Lenze E82ZMFBC001 User Manual

Page 54: Commissioning

Advertising
background image

7 Commissioning

Before switching on

EDK82ZMFBC-001 DE/EN/FR 7.0

54

H1inbet-INB_01_warn

7

Commissioning

Before switching on

Commissioning depends on the device combination (bus-I/O and fieldbus function

module). The commissioning procedure is described in the documentation on the fieldbus

system and the frequency inverter.

Switch position

1

ON

2 3 4 5

ON

OFF

Note!

ƒ

Make sure to set the DIP switch and C0034 to the same range, otherwise

the analog input signal at X3/8 will be interpreted incorrectly by the basic

device.

ƒ

If a setpoint potentionmeter is supplied internally via X3/9, make sure to

set the DIP switch to the voltage range 0 ... 5 V. Otherwise it will be

impossible to cover the entire speed range.

Signal at X3/8

Switch position

C0034

1

2

3

4

5

0 ... 5V

OFF

OFF

ON

OFF

OFF

0

0 ... 10 V (Lenze setting)

OFF

OFF

ON

OFF

ON

0

0 ... 20 mA

OFF

OFF

ON

ON

OFF

0

4 ... 20 mA

OFF

OFF

ON

ON

OFF

1

4 ... 20 mA (open-circuit monitored)

OFF

OFF

ON

ON

OFF

3

-10 ... +10 V

ON

ON

OFF

OFF

OFF

2