Wiring installation, Typical motor connections, Terminal designations – Rockwell Automation 193/592-EC1/EC3/EC5 E3 and E3 Plus Solid-State Overload Relay - Quick Reference User Manual

Page 8

Advertising
background image

8

Publication 193-QR003B-EN-P - October 2009

Wiring Installation

Typical Motor Connections

Refer to the product nameplate or user manual for power lug termination information
including:

•

Terminal wire size and torque specifications

•

Maximum wire lengths

•

Lug kit catalog numbers (108…1250 A)

For reliable input signal processing, input wiring should be routed in raceways separate from
power cabling.

Terminal Designations

Figure 4: E3 and E3 Plus Feature Overview

E3 PLUS

LED Status Indicators

DeviceNet Port

Input Terminals

Test/Reset Button

Node Address Switches
(Series B and later)

Output and PTC Terminals

Ground Fault Sensor Input

Voltage Input Module
Connection
(193/592 EC5 only)

Advertising