Rockwell Automation 1756-CNB ControlLogix ControlNet Bridge Module Installation Instructions User Manual

Page 19

Advertising
background image

19

Publication 1756-IN571B-EN-P - April 2001

3. Apply power to the module and check module status. Use the

following flowchart as a guide.

Turn the chassis
power supply on.

Module
status
indicator
red?

See the
troubleshooting
table on page 23.

Module performs a
power-on self-test
initialization.

No

Yes

INIT

No

Yes

Module
status
indicator
red?

INIT has failed, and
the module displays
an error message
(see pages 23 - 26).

Replace the module.

OR

WAIT

RM

Modules are in a
redundant control
chassis pair.

Initialization is
complete. The
status indicator
blinks green.

Channel A and B
indicators alternately
flash.

Channel A and B
indicators display the
network condition as
listed on page 26.

Module
status
displays
OK?

No

See the
troubleshooting table
beginning on page 23.

Yes

Module is functional
and operating.

OK

A#xx

Advertising
This manual is related to the following products: