About This Publication

Use these instructions to install SecureConnect™ units in CENTERLINE® 2500
Low Voltage Motor Control Centers (MCCs).

For additional information on the CENTERLINE 2500 MCC, refer to the
CENTERLINE 2500 Low Voltage Motor Control Centers Installation
Instructions, publication

2500-IN001

.

Before You Begin

When installing arc-resistant units, you must make sure you are installing a unit
that has the same arc-resistance rating as the section in which it is being installed.
Units that are not rated for 300 ms arc duration must not be installed in a section
that is rated for 300 ms arc duration. The arc-resistant rating will not apply if that
is done.

Topic

Page

About This Publication

3

Before You Begin

3

Height Considerations

4

Recommended Tools

4

Door Latches

5

Safety Guidelines for Installing and Removing SecureConnect Units

6

Unit Support Pan

6

Install the Unit

7

Remove the Unit

12

Moving SecureConnect Units

14

Troubleshooting

14

Additional Resources

15

ATTENTION: All covers and doors must be in place before applying power to the
MCC. If units are removed, they must be replaced with the appropriate items
such as units, doors, and unit support pans.