Install the unit – Rockwell Automation 2500 SecureConnect Units for CENTERLINE 2500 Low Voltage Motor Control Centers User Manual

Page 7

Advertising
background image

Rockwell Automation Publication 2500-IN005B-EN-P - April 2012

7

SecureConnect Units for CENTERLINE 2500 Low Voltage Motor Control Centers

Install the Unit

Follow this procedure to install the unit.

Figure 1 - SecureConnect Label Locations

1. Open the unit door completely and be sure that the unit support pan has

been installed and that the gear opening is toward the front.

ATTENTION: Do not attempt to install or remove a unit when the unit main
switch is in the ON/I position.

Verify that the circuit breaker handle is in the OFF/O position before installing unit.

IMPORTANT

There are two decals on each SecureConnect unit. See

Figure 1

for decal

locations.

Turn Off

Circuit Breaker

Press

Black Button

Move Handle

Gear Opening
Toward Front

Unit Guide Tracks

Gear is locked in
this position.

Unit Support Pan

Advertising