Input phasing check – Rockwell Automation 7000 PowerFlex Medium Voltage (B Frame) Commissioning - ForGe (PanelView 550) User Manual
Page 93

Rockwell Automation Publication 7000-IN006B-EN-P - May 2013
89
Commissioning the Drive Chapter 5
Input Phasing Check
There are 9 voltage test points on the ACB board that will allow you to look at
each voltage level individually.
These test points are labeled as follows:
Table 1 - ACB Test Points and Associated Voltage Signals
All of these test points can be measured to either the Analog Ground (AGND)
on the board or the TE ground in the low voltage section. You can use V2uv as
your reference (trigger on this waveform) and verify all the other test points using
the table above. It is easier to use zero crossings on your oscilloscope as the
reference points when checking the phase shifts.
Verify the following relationships:
1. V and W in each bridge should be lagging U by 120° and 240°, respectively.
2. 3U, 3V, and 3W should be lagging 2U, 2V, and 2W by 20° (-20°),
respectively.
Test Point Description
Isolation Transformer:
Secondary Phasing and Bridge
Phase Relationship
with respect to V2uv
(2U)
V2uv
2u
Master
0
°
V2vw
2v
Master
-120
°
V2wu
2w
Master
-240
°
V3uv
3u
Slave 1
-20
°
V3vw
3v
Slave 1
-140
°
V3wu
3w
Slave 1
-260
°
V4uv
4u
Slave 2
+20
°
V4vw
4v
Slave 2
-100
°
V4wu
4w
Slave 2
-220
°