Panel mounting guidelines, Before unpacking the monitor, Installing your monitor – Rockwell Automation 6185-C_B Industrial 15 12 Inch Monitor User Manual User Manual

Page 13

Advertising
background image

Installing Your Monitor

13

Publication 6185-5.1

Panel Mounting Guidelines

Observe the following precautions before installing the unit in a panel:

Confirm that there is adequate space behind the panel. Remember to

allow extra space (0.5 in. or 12.7 mm behind and on each side) for air
circulation.

For a 6185-C, a cabinet with a minimum depth of 4.4 in. (112mm)

is sufficient.

For a 6185-B, a cabinet with a minimum depth of 3.25 in.

(82.6mm) is sufficient.

Take precautions so that metal cuttings do not enter any components

that are already installed in the panel.

Supporting panels should be at least 14 gauge to ensure proper

sealing against water and dust and to provide proper support. The
mounting hardware supplied accommodates panels up to 0.25 in.
(6.35 mm) thick.

Note:

Supporting panels must be cut and drilled to
specifications before installation.

ATTENTION: Failure to follow these warnings may
result in personal injury or damage to the panel
components.

Before Unpacking the Monitor

Before unpacking a new monitor, inspect the shipping carton for
damage. If damage is visible, immediately contact the shipper and
request assistance. Otherwise, proceed with unpacking.

Note:

Make sure you keep the original packaging for the monitor
in case you need to return the monitor for repair.

Installing Your Monitor

1. Prepare panel cutout for monitor. Refer to specific cutout drawings

in Appendix B: Monitor Dimensions on page 41.

2. Carefully remove the monitor from its packaging.

Advertising