Rockwell Automation 9220-CC QUICK START CONTROLNET NTWK User Manual

Page 2

Advertising
background image

ControlNet Network Compliance Tool

2

Publication 9220-10.3 — September 1997

Understanding the Tool

Use this tool to:

examine and analyze a device for ControlNet network protocol
compliance

assist in the testing and debugging of ControlNet products

Each test has a script file (*.tst) and an executable file (*.exe).

This tool contains these tests:

Test

Typical test time

Is used to test the

mr_obj.tst
mr_tst.exe

15 minutes

MR (message router)

cm_obj.tst
cm_tst.exe

30 minutes

CM (connection manager)

cnet_obj.tst
cnet_tst.exe

20 minutes

ControlNet object

dev_obj.tst
dev_tst.exe

15 minutes

Device/Identity

cs_obj.tst
cs_tst.exe

20 minutes

CS (ControlNet scheduling)

ccm_obj.tst
ccm_tst.exe

20 minutes

Keeper object

kpr_stub.tst
ks_tst.exe

1 minute

Keeper stubs

alltests.tst

1.3 hours

Core objects

ccm_cs.tst

40 minutes

Keeper and CS object

9220-KTCT

ControlNet link

personal computer running
compliance tests (9220-CC)

Use this computer to run the tests
and create log files (.log) of the tests.

device
under
test (DUT)

phase 1.5
ControlNet
device

Advertising