Rockwell Automation 9220-CC QUICK START CONTROLNET NTWK User Manual
Page 2

ControlNet Network Compliance Tool
2
Publication 9220-10.3 — September 1997
Understanding the Tool
Use this tool to:
•
examine and analyze a device for ControlNet network protocol
compliance
•
assist in the testing and debugging of ControlNet products
Each test has a script file (*.tst) and an executable file (*.exe).
This tool contains these tests:
Test
Typical test time
Is used to test the
mr_obj.tst
mr_tst.exe
15 minutes
MR (message router)
cm_obj.tst
cm_tst.exe
30 minutes
CM (connection manager)
cnet_obj.tst
cnet_tst.exe
20 minutes
ControlNet object
dev_obj.tst
dev_tst.exe
15 minutes
Device/Identity
cs_obj.tst
cs_tst.exe
20 minutes
CS (ControlNet scheduling)
ccm_obj.tst
ccm_tst.exe
20 minutes
Keeper object
kpr_stub.tst
ks_tst.exe
1 minute
Keeper stubs
alltests.tst
1.3 hours
Core objects
ccm_cs.tst
40 minutes
Keeper and CS object
9220-KTCT
ControlNet link
personal computer running
compliance tests (9220-CC)
Use this computer to run the tests
and create log files (.log) of the tests.
device
under
test (DUT)
phase 1.5
ControlNet
device