Rockwell Automation HPK-Series Asynchronous Servo Motor User Manual

Page 13

Advertising
background image

HPK-Series Asynchronous Servo Motors 13

Publication HPK-IN001C-EN-P - June 2010

7.

Connect the power cable leads (U/T1, V/T2, and W/T3) to the power terminals.

8.

Connect the ground and shield connect to the ground lug.

9.

Connect the other end of the power cable to the three-phase 380…460V AC power
outputs on the controller as described in the instruction manual for that device.

Proper grounding of power cable shielding is essential for error-free operation. Refer to
the instruction manual of your drive for recommended grounding techniques.

10.

Connect blower leads to the three-phase 380…460V ac power source as outlined in the
table below and shown in the

Blower Wiring Diagrams on page 14

.

AC Input to Motor

Connect Input

with Wire Color

to Terminal

M8 Clamping
Bolt Torque

M6 Cover
Threaded Bolt
Torque

Line 1

Black

U/T1

14 N•m (1.6 lb-in.)

8 N•m (0.9 lb-in.)

Line 2

Blue

V/T2

Line 3

Brown

W/T3

Ground Green/Yellow

GND

Shield Yellow/Green

ATTENTION: The motor is at line voltage when ac power is connected.

Disconnect and lockout all ungrounded conductors of the ac power line before
attempting any to connect or disconnect power wiring at the motor.

Failure to observe these precautions could result in severe bodily injury or loss
of life.

AC Input to Blower (380…460V)

Connect Input

with Wire Color

to Terminal

Line 1

Black

U

Line 2

Blue

V

Line 3

Brown

W

Ground Green/Yellow

GND

Advertising