Metrohm 754 Dialysis Unit User Manual

Page 23

Advertising
background image

2 Installation

754 Dialysis Unit

20

2.3.7

Conditioning the dialysis system

Before effecting the first analysis, rinse the dialysis cell, the inserted di-

alysis membrane and all tubing connections with ultrapure water. Pro-

ceed as follows:

1 Settings on the 733 IC Separation Center

Press the <FILL> key for injection valve A on the 733 IC

Separation Center. This switches injection valve A to the

"FILL" position.

Press the <FILL> key for injection valve B on the 733 IC

Separation Center. This switches injection valve B to the

"FILL" position.

2 Starting up the 754 Dialysis Unit

Immerse the two suction tubings 26

26 and 27

27 in the acceptor

solution (ultrapure degassed water).

Set the <REMOTE> switch 22 on the 754 Dialysis Unit to

"OFF".

Switch on the 754 Dialysis Unit with mains switch 13

13 and set

the <PUMP> switch 33 to "ON".

Adjust the contact pressure for both tubing cartridges: Press

contact pressure lever 55 upwards until the solutions just start

to be drawn in. Then push the contact pressure lever up-

wards until it clicks again to achieve the optimum contact

pressure.

Rinse the dialysis system with ultrapure water for approx.

10 min and check that the solutions flow steadily through the

two tubings into the waste bottle.

3 Conditioning the dialysis membrane

Press the <INJECT> key for injection valve B on the 733 IC

Separation Center. This switches injection valve B to the

"INJECT" position.

Rinse the dialysis system with ultrapure water for approx.

20 min. Check that the solutions flow steadily through the two

tubings into the waste bottle.

Check all tubing from the storage vessels through the tubing

cartridges and the dialysis cell up to the waste containers for

any leaks. If liquid escapes anywhere, tighten or replace the

corresponding connection.

If air bubbles remain in the dialysis cell, unscrew PEEK tubing

25

25 (Acceptor solution) and PTFE tubing 45

45 (sample) from

outlets 41

41 and 44

44 of the dialysis cell and wait until the air

bubbles disappear. Reconnect the tubings to the dialysis cell.

Advertising