Metrohm 754 Dialysis Unit User Manual

Page 36

Advertising
background image

4.2 Maintenance and servicing

754 Dialysis Unit

33

5 Close dialysis cell

•

Place top part

38

38 on bottom part 35

35 so that both parts lie

flush.

•

Screw the 5 screws

39

39 in all the way in and tighten using the

6.2621.070 Allen key.

6 Attach dialysis cell

•

Place the assembled dialysis cell

34

34 in cell holder 66 of the

754 Dialysis Unit.

7 Connect dialysis cell

•

Screw PEEK capillary

24

24 to inlet opening 42

42 of the bottom

part

35

35 of the cell.

•

Screw PEEK capillary

25

25 to outlet opening 41

41 of the bottom

part

35

35 of the cell.

•

Screw PTFE capillary

33

33 to inlet opening 43

43 of the top part 38

38

of the cell.

•

Screw PTFE capillary

45

45 to the outlet opening 44

44 of the top

part

38

38 of the cell.

8 Condition dialysis membrane

•

Immerse suction tubings

26

26 and 27

27 in the acceptor solution,

switch on pump with the <PUMP> key

1

1 and rinse the di-

alysis system with acceptor solution for approx. 20 min.

Check that the solution flows steadily from the two lines into

the waste bottle.

•

Check all tubings between the storage vessels, the tubing

cartridges, the dialysis cell and the waste bottles for leaks. If a

leak occurs anywhere, tighten or replace the connection in

question.

•

Switch off pump with the <PUMP> key

11.

Advertising