System Operation

EZ-SCREEN Grid

Instruction Manual

4.5 Periodic Checkout Requirements

To ensure continued reliable operation, the System should be checked out
periodically.

At every shift change, power-up and machine setup change, the Daily checkout
should be performed; this checkout may be performed by a Designated or
Qualified Person (see Section 6.4 for the procedure).

Semi-annually, the system and its interface to the guarded machine should be
thoroughly checked out; this checkout must be performed by a Qualified Person
(see Section 6.5). A copy of these test results should be posted on or near the
machine.

Whenever changes are made to the System (either a new configuration of the
EZ-SCREEN System or changes to the machine), the Commissioning Checkout
should be performed (see Section 6.3).