Aileron linkage installation – E-flite BAe Hawk 15 DF ARF User Manual

Page 8

Advertising
background image

8

E-flite BAe Hawk ARF Assembly Manual

Aileron Linkage Installation

Required Parts

Aileron pushrod keeper (2)
Aileron pushrod wire, 5

15

/

16

-inch (151mm) (2)

Servo cover (2)
Aileron control horn (2)

Clear tape

Required Tools and Adhesives

Side cutters

Medium CA

Pin drill

Drill bit: 5/64-inch (2mm)

Felt-tip pen

Hobby knife w/#11 blade

Needle-nose pliers Hobby scissors

Medium grit sandpaper



1. Using a felt tip pen mark the aileron for the

aileron control horn. The horn is positioned 13/32-

inch (10mm) back from the hinge line of the

aileron. Also mark a center line that corresponds

with the aileron servo horn.

Use low-tack tape to tape the aileron in position so it

doesn’t move during the linkage installation. This will

make the procedure go easier and will help in keeping

things aligned during the linkage installation process.



2. Position the control horn so it is aligned with the

marks made in the previous step. Lightly press the

control horn down to leave the indentations of the

prongs in the aileron. The control horn should be

aligned 90 degrees to the aileron hinge line in line

with the servo arm.



3. Use side cutters to remove 3/32-inch (2mm)

from the prongs of the servo horn so they do not

extend through the top of the aileron when the

control horn is installed.



4. Use a pin drill and 5/64-inch (2mm) drill bit

to drill the two holes for the control horn prongs.

Use care not to drill into the aileron too far and

accidentally drill through the top of the aileron.

Advertising