Installation, Preperation, 1 preparing for installation – GBC EBA 721-05 LT User Manual

Page 5

Advertising
background image

- 5 -

68

3x

1.

3.

2.

3x

5.

3x

4.

3x

3x

1.

2.

3x

3.

4.

3x

5.

3x

6.

3x

6.

3x

2. Installation

- Transport the machine on the pallet to its

destination using a pallet truck.

- 6 strong people are required to lift the machine

from the pallet.

- The machine must be installed on a sturdy, dry

and level floor.

Danger!

- The machine must not be located outside.
- Do not use in the vicinity of inflammable

liquids or gases.

- Do not use in humid environments.
- Protect mains cable against heat, oil and

sharp edges.

2.1 Preparing for installation

The machine is delivered ready for operation. As
an option, side tables, left and right, are available.
These should be mounted so that the surfaces are
level with the main table.

Danger!
The machine must not be put into operation

without the safety light beam.

Advertising