Cdv series direct vent gas fireplace – Vermont Casting 36CDVRRN User Manual

Page 20

Advertising
background image

20

CDV Series Direct Vent Gas Fireplace

20010175

7. Install roof support (Fig. 36 & 37) and roof flashing

making sure upper flange is below the shingles. (Fig.
36)

8. Install appropriate pipe sections until the venting is

above the flashing. (Fig. 36)

9. Install storm collar and seal around the pipe.
10. Add additional vent lengths for proper height. (Fig

38)

TWL101a

Twist Lock Pipe

2/8/99 djt

3 #5 Sheet Metal

Screws per Joint

Storm Collar

TWL101a

Fig. 36 Roof flashing.

Sealant

FP1022

Typical Straight Up Installation

1/26/00 djt

50’

(15 m)

Storm Collar

Roof Flash-

ing

Vent

Termination

Roof

2’ Min.

Roof Support

Attic Insulation

Shield

Attic

Insulation

Joists

Joists

FP1022

Fig. 37 Typical straight-up installation.

Min.

2' (610 mm)

FP1185

Fig. 38 Minimum termination to roof clearance.

The enlarged ends of the vent section
always face down. (Fig. 36)