Cdv series direct vent gas fireplace, Vertical through-the-roof installation – Vermont Casting 36CDVRRN User Manual

Page 25

Advertising
background image

25

CDV Series Direct Vent Gas Fireplace

20010175

Max. 10' (3m)

Max. Height

40' (12m)

Min. Height

7���' (2.3m)

FP1244

through the roof

max/min dims

12/02

Pipe Straps Every

3’ (914mm)

FP1244

Fig. 51 Support straps for horizontal runs.

Two sets of 45° elbows offsets within these vertical
installations. From 0 to a maximum of 8’ (2.m) of
vent pipe can be used between elbows. (Fig. 52)

7DVCS must be used to support offsets. (Fig. 54)
This application will require that you first determine
the roof pitch and use the appropriate starter kit.
(Refer to Venting Components List)

The minimum height of the vent above the highest
point of penetration through the roof is 2’ (610 mm).
(Fig. 56)

1

2

3

4

Max. 8' (2.4m)

FP1245

through the roof

90 & 45 degree

12/02

1 + 2 + 3 + 4 = 270°

FP1245

Fig. 52 Typical offset application.

Vertical Through-the-Roof Installation

1. Locate your fireplace.
2. Plumb to center of the (4” (102 mm) flue collar from

ceiling above and mark position.

3. Cut opening equal to 9³⁄₈” x 9³⁄₈” (240 x 240 mm).
4. Proceed to plumb for additional openings through the

roof. In all cases, the opening must provide a minimum
of 1” (25 mm) clearance to the vent pipe, i.e., the hole
must be at least 9³⁄₈” x 9³⁄₈” (240 x 240 mm).

5. Place fireplace into position.
6. Place firestop(s) #7DVFS or Attic Insulation Shield

#7DVAIS into position and secure. (Fig. 53)

7. Install roof support (Fig. 54) and roof flashing making

sure upper flange of flashing is below the shingles.
(Fig. 54)

8. Install appropriate pipe sections until the venting is

above the flashing. (Fig. 54)

CFM100

Firestop-Vertical

09/20/00

11"

11"

Attic Insulation
Shield

Joist

Ceiling In-
stallation

Joist

Upper Floor

Firestop Spacer

Nails (4)

CFM100a

Fig. 53 Place firestop spacer(s) and secure.

Advertising