CDV Series Direct Vent Gas Fireplace

20010175

X

FP1240

Fig. 45 Vertical height requirement.

wall face plus 2” (51 mm) (or the distance required if
installing a second 90° elbow). (Fig. 46)

Always install horizontal venting on a level
plane.

X

FP1241

Fig. 46 Horizontal length requirement.

STEP 5
Use appropriate length of pipe sections - telescopic or
fixed - and install the horizontal vent sections. The sec-
tions which go through the wall are packaged with the
starter kit, and can be cut to suit if necessary. (Fig. 47)

Sealing the gaps between the vent pipe
and firestop with high temperature sealant
will restrict cold air being drawn in around
fireplace.

STEP 6
Guide the vent terminations 4” and 7” collars into their
respective vent pipes. Double check that the vent pipes
overlap the collars by 2” (51mm). Secure the termina-
tion to the wall with screws provided and caulk around
the wall plate to weatherproof. (Fig. 48) As an alterna-

FP1242

Fig. 47 Through the wall.

tive to screwing the termination directly to the wall you
may also use expanding plugs or an approved exterior
construction adhesive. You may also attach the termi-
nation with screws through the inner body into the 4”
(102 mm) vent pipe however for this method you must
extend the 4” (102 mm) pipe approximately 6” (152 mm)
beyond the outer face of the wall.
Support horizontal pipes every 3’ (914 mm) with metal
pipe straps. Make sure the horizontal vent pipe is in-
stalled on a level horizontal plane.

FP1243

Fig. 48 Apply high temperature sealant to collars or termina-
tions.