3 machine torch head replacement, 3 machine torch head replacement -4 – Tweco 15XC CE Merlin PAK User Manual

Page 76

Advertising
background image

SERVICE

4 - 4

Manual 0-2529

4.3 MACHINE TORCH HEAD REPLACEMENT

Machine Torch Leads

Replacement

WARNING

Disconnect primary power to the system before
disassembling the torch, leads, or power supply.

Refer to Figure 4-D (page 4-5) and:

1. Remove the electrical tape from the end of the nylon

outer leads sleeving next to the mounting assembly
and push the sleeving back onto the leads approxi-
mately one foot (0.3 m) to expose the shielded inner
leads sleeving.

2. Remove the electrical tape from the shielded inner

sleeving and push back over the leads approximately
one foot (0.3 m).

3. Unscrew the mounting assembly from the torch head.

Slide the mounting assembly back over the leads to
expose the leads connections.

4. Remove the tape that secures the lead connections

around the insulating tab. Disconnect the plasma,
secondary, coolant supply, and coolant return leads
from the torch head.

To minimize coolant leaks during torch head replacement,
perform the operation with the torch head above the level
of the coolant reservoir.

5. Connect the plasma, secondary, coolant supply, and

coolant return leads onto the replacement torch head
fittings.

6. Use electrical tape to secure the leads in place on the

insulating tab. Locate the tape over the ferrule on the
negative lead.

NOTE

Advertising