12 service and test procedures, 12 service and test procedures -27 – Tweco 15XC CE Merlin PAK User Manual

Page 99

Advertising
background image

Manual 0-2529

4 - 27

SERVICE

4.12 SERVICE AND TEST PROCEDURES

The following tests are suggested for specific problems
listed in the troubleshooting guide. The letter designations
correspond to those listed in the “Remedy” column of the
troubleshooting section.

Several of these tests involve voltage measurements that
must be made with power on. Use extreme care when
making these tests. Tests requiring voltage measurements
are marked with the warning symbol. Disconnect primary

WARNING

A. Voltage Selection

PC Board Check

When wall power is first turned on, the voltage selection
PC board (see Figure 4-G, page 4-19) senses the low volt-
age AC present at J6-20, J6-22, and J6-24 (center tap). The
voltage selection board determines whether the voltage is
in the lower or higher part of the selected input voltage
range. If the input voltage is within the upper part of the
range, the board energizes K1, K4, and K5 relays (labeled
‘HV’ on the system schematic). If the input voltage is
within the lower part of the range the board energizes the
K2 and K3 relays (labeled ‘LV’ on the schematic). If HV is
selected, the red LED indicator (D18) on the voltage
selection board will be lit. The relays do not energize until
SW1-B (one pole of the ON/OFF switch) is closed because
the DC voltage to the coils passes through it.

1. Check the AC input from J6-24 to both J6-20 and J6-22

for 12 - 18 VAC.

2. Check the AC voltage from J6-24 to both J6-17 and J6-18

for 16 - 22 VAC.

3. If input voltages are correct, check output from J6-19 to

J6-21 for 14 - 18 VAC.

4. If output is not present between J6-19 and J6-21, check

between J6-24 (-) and both J6-16 and J6-23 (+) for 12 - 16
vdc. If voltage is present at both points or neither,
replace the voltage selection board. If voltage is found
at J6-23 but not at J6-16, check SW1-B and all wiring and
connections.

28 VAC Test

Advertising