Transport & placement, Transport procedure, Warning – Wheatheart GHR 80/100 x 31-71ft Augers EMD User Manual

Page 37

Advertising
background image

W

HEATHEART

- G

RAIN

A

UGER

EMD

4. T

RANSPORT

& P

LACEMENT

GHR 80

X

31’-71’ & 100

X

31’-71’

4.1. T

RANSPORT

P

ROCEDURE

30642 R0

37

4. Transport & Placement

4.1. TRANSPORT PROCEDURE

Follow all safety precautions when transporting the auger and use a proper
towing vehicle.

1. If auger is raised, place in full down position. The roller track shoe should be

seated against the upper track stop with slight tension on the lift cable. Refer
to “Lowering & Completion” on page 44.

Important:

The winch must have a minimum of 3 wraps of cable on drum when auger is in
transport position.

2. Lock winch: turn handle clockwise until 2 clicks are heard.
3. Place and secure hitch pin and safety chain. The safety chain should be

threaded though handle on the lower tube and wrapped around auger tube
before attaching to the towing vehicle (Figure 4.1).

Figure 4.1

Important:

Use a type of hitch pin (see Figure 4.1) that will not allow auger to separate from
towing vehicle..

Warning: Before continuing, please reread the safety information relevant to this section at
the beginning of this manual. Failure to follow the safety instructions can result in serious
injury, death, or property damage.

WARNING

If auger wheels are partially or fully buried in
snow or grain, failure to clear area around the
wheels before moving may cause damage to
the auger or result in serious injury.

Advertising