Lowering & completion, Notice – Wheatheart GHR 80/100 x 31-71ft Augers EMD User Manual

Page 44

Advertising
background image

5. O

PERATION

W

HEATHEART

- G

RAIN

A

UGER

EMD

5.3. O

PERATING

P

ROCEDURE

GHR 80

X

31’-71’ & 100

X

31’-71’

44

30642 R0

• If the problem is plugging, clear as much of the grain as possible using a

piece of wood, vacuum cleaner, or other tool before restarting auger. Do
not reach in and use your hands
(See Auger Drive & Lockout Proce-
dure on page 41.)

5.3.4. L

OWERING

& C

OMPLETION

At the completion of an operation, the auger should be moved to the next work
area or to a storage area. After operation:

1. Clean entire work area.
2. Remove all supports and chocks.
3. Move

auger

out

of working position and lower fully (see shaded box that

follows for lowering procedure).

4. Move

auger

to

the next work area or to a storage area and then clean out.

5. Clean out auger.

a. Shut off motor and lock out power.

b. Manually clean out grain with a piece of wood, vacuum cleaner, or other

tool. Do not use hands.

6. Prepare for transport and placement or storage (see appropriate chapters for

more information).

NOTICE

Starting the auger under load may result in damage to unit.
Be sure there is no blockage.

L

OWERING

1. Ensure area beneath auger is clear.
2. Turn winch counterclockwise to lower (there will be no clicking sound when

lowering).

3. After lowering, turn handle clockwise until you hear 2 clicks to lock brake.

• Use a firm grip on handle. Do not release unless the ratchet pawl is fully

engaged.

• The winch is designed for manual operation only.
• When lowering, never continue to turn handle counterclockwise if the

cable does not keep moving out under load. This will disengage the
brake mechanism and create an unsafe condition. If this happens, winch
in slack cable and correct problem.

Do not leave auger in raised position when not in use. Auger could drop rapidly
due to a cable break. High winds may also upset auger.

Advertising