Operation, Pre-operational checklist, Auger drive & lockout procedure – Wheatheart GHR 80/100 x 31-71ft Augers EMD User Manual

Page 41

Advertising
background image

W

HEATHEART

- G

RAIN

A

UGER

EMD

5. O

PERATION

GHR 80

X

31’-71’ & 100

X

31’-71’

5.1. P

RE

-O

PERATIONAL

C

HECKLIST

30642 R0

41

5. Operation

5.1. PRE-OPERATIONAL CHECKLIST

Before operating auger each time, the operator must confirm the following:

• All fasteners are secure as per assembly instructions.
• Drive belt(s) are not frayed or damaged.
• Drive belt(s) are properly adjusted and aligned.
• Lift cable is not frayed or damaged.
• Lift cable is properly seated in cable sheaves.
• Cable clamps are secure.
• Tube alignment is reasonably straight.
• Auger wheels are chocked.
• Intake area and discharge spout are free of obstructions.
• Proper maintenance has been performed.
• All safety guards are in place and secure.

5.2. AUGER DRIVE & LOCKOUT PROCEDURE

Warning: Before continuing, please reread the safety information relevant to this section at
the beginning of this manual. Failure to follow the safety instructions can result in serious
injury, death, or property damage.

Drive Type

Before Operation

Lockout

Electric Motor

Before starting motor, ensure

• motor is properly grounded
• pulley guards are in place and

secure

The electric motor should be
equipped with a main power
disconnect switch capable of being
locked in the off-position only. The
switch should be in the locked
position during shutdown or
whenever maintenance is performed
on the auger.

If reset is required, disconnect all
power before resetting motor.

Advertising