Emd drive – Wheatheart WHR 130 x 41ft Auger PTO-SD User Manual
Page 19

WHEATHEART - GHR & WHR GRAIN AUGERS
3. A
SSEMBLY
GRAIN AUGERS
3.6. EMD D
RIVE
30661 R2
19
Figure 3.6
3.6. EMD DRIVE
1. Remove the driveshaft segment
nearest the intake end of auger (9’9"
long). This driveshaft is not used on
EMD augers.
2. Clean dirt and paint from driveshaft
ends and inside couplers.
3. Remove and discard driveshaft bearing
at third bearing bracket from intake
end.
4. Remove chain from chain coupler on
gearbox, then attach chain coupler sprocket to driveshaft with a 1/4" x
1-1/2" square key. Tighten set screw.
5. Place gearbox assembly on auger tube, then reinstall chain coupler leaving
minimum of 1/16" between coupler sprockets.
6. Secure gearbox assembly to auger tube with two halfbands and four 7/16" x
1-1/4" bolts and locknuts. Tighten securely.
7. Attach the chain coupler guard to gearbox base with two 3/8" x 3/4" bolts and
washer locknuts.
Important:
Fill gearbox half full with EP90 lube oil before operating auger. Do not overfill.
Failure to heed will void warranty.
It is easier to fill oil into the gearbox when it is
in the horizontal position.
Table 3.2. Horsepower
Requirements
a
a. Approximate horsepower
requirements under normal
conditions. When augering
full tube of high moisture
grain, additional horsepower
will be needed.
Auger Length
13” x 41’
ELECTRIC– HP
41’
20