Winch & lift cable – Wheatheart WHR 130 x 41ft Auger PTO-SD User Manual

Page 25

Advertising
background image

WHEATHEART - GHR & WHR GRAIN AUGERS

3. A

SSEMBLY

GRAIN AUGERS

3.10. W

INCH

& L

IFT

C

ABLE

30661 R2

25

8. Attach upper lift arms to roller track shoe with one 3/4" x 6-1/2" bolt and

locknut. Do not over-tighten. Tighten snug only; this bolt acts as a pivot point
(Figure 3.14).

9. Lower upper end of auger slowly until the roller track shoe rests against the

track stop.

3.10. WINCH & LIFT CABLE

1. Attach cable to winch using one of the 2

methods shown, depending on supplied
winch.

• If method 2 is used, the nut must be on

the outside of the drum to prevent dam-
age to the cable. Leave about one inch
(2.54 cm) of cable extending past the
clamp. Cable must leave winch from
bottom side.

2. The winch must have a

minimum of 3 wraps of cable
on drum when auger is in
transport position.

3. Attach winch to winch mount

with three 3/8” washer
locknuts.

Winch handle must be
positioned on the left side of the
auger (determine left by
standing at the intake end,
facing the discharge end).

4. Thread lift cable under and around roller on track shoe, then back to cable

attach rod welded to lower end of track.

5. Wrap cable 1-1/2 times around the

cable attach rod and secure with
three cable clamps. Position cable
clamps as shown in Figure 3.16
and 3.17. Tighten cable clamps
securely.

Make certain cable is properly seated
in cable groove before raising auger.

Figure 3.17

Figure 3.15

Important:

Figure 3.16

Note:

Advertising
This manual is related to the following products: