Operation, Pre-operation checklist, Notice – Wheatheart Post Pounder User Manual

Page 25

Advertising
background image

W

HEATHEART

- P

OST

P

OUNDER

5. O

PERATION

H

IGH

& H

EAVY

H

ITTER

AND

H

IGH

& H

EAVY

H

ITTER

P

LUS

5.1. P

RE

-O

PERATION

C

HECKLIST

IM4 R3

25

5. Operation

5.1. PRE-OPERATION CHECKLIST

Efficient and safe operation of this unit requires that each operator reads and
understands the operating procedures and all related safety precautions outlined
in this manual.

Before operating the unit, and each time thereafter, the following should be
reviewed:

• Follow the service schedule.
• Check hydraulic system oil level.
• Ensure that all hydraulic lines are free from damage, and that all fittings

are tight.

• Visually inspect the unit for damage to components. Replace or repair any

damaged or questionable parts.

• Check the work site and clean up the area, if needed.
• Use only a tractor, towing vehicle, or skid steer loader of adequate power

and capacity to operate the machine.

• Check that all guards are installed, secured, and functioning as intended.

Do not operate with missing or damaged guards. Keep guards in good
working order.

• Ensure that the plastic slides are intact on the pounder mast (HH Plus

only) and slide box.

• Ensure that the machine is securely attached to the towing vehicle, trac-

tor, or skid steer loader.

• Consult local utility companies to identify the location of buried power/gas

lines.

• Each day before using the machine, ensure that the pounder head bolts

are torqued to 760 lb-ft.

Warning: Before continuing, ensure you have read and understand the relevant information
in the safety section. Safety information is provided to help prevent serious injury, death, or
property damage.

NOTICE

Ensure that the pounder is attached to equipment that has
sufficient capacity to tow or lift the machine.

Refer to Section 9.3. for pounder specifications.

Advertising