Assembly – Great Plains CTA4000 Predelivery Manual User Manual

Page 10

Advertising
background image

160-037Q

Table of Contents

Appendix

2013-08-21

6

CTA4000 & CTA4000HD

Table of Contents

Appendix

Great Plains Manufacturing, Inc.

Assembly

This section covers tasks to be completed prior to
hitching to the leading air cart. If the air cart is not
available, reconsider performing assembly at this time,
as the cart is needed to safely move the assembled
implement.

Crushing Hazard:
You may be severely injured or killed by implement frames if
they fall. Always support frame sections with jack stands or
blocks before working on implements raised off ground. Obey
all safety instructions from lifting equipment manufacturer. Do
not walk or place any part of the body under raised sections.
Be sure shipping stands are securely attached prior to lifting.
Be sure lifting equipment has enough capacity.

1.

Remove frame sections from truck and place them
on the ground. Two sections are stacked together.

2.

Disconnect stacked sections. Support top section
with hoist or forklift and remove U-bolts that connect
top section to bottom section. Leave shipping stands
on top and bottom frame sections.

3.

Carefully lift top section off bottom section and place
on solid, level ground or concrete if available.

4.

With shipping stands still bolted to each section,
move center and left sections to center of assembly
area.

Refer to Figure 3
5.

Check that the pivot bushings

are in place in

center-section pivot tubes.

6.

Remove pivot pins

from wing clevis

. Align wing

clevis with center-section pivot tubes. Re-insert pivot
pins and drive into place. Secure with roll pins.

7.

Repeat step 5 and step 6 for right wing.

1

3

3

2

1

1

2

1

U

D

F

B

L

R

Figure 3

Wing to Frame Assembly

17177

1

2

3

Advertising
This manual is related to the following products: