Center tower installation, Wing tower installation, Center tower installation wing tower installation – Great Plains CTA4000 Predelivery Manual User Manual

Page 26: Rota te t ow ard center of drill

Advertising
background image

22

CTA4000 & CTA4000HD

Table of Contents

Appendix

Great Plains Manufacturing, Inc.

160-037Q

Table of Contents

Appendix

2013-08-21

Center Tower Installation

Refer to Figure 27 and Figure 27
2.

Loosen 2

1

2

×2

1

2

inch U-bolts

that hold tower on

support bracket.

3.

Reposition tower so bottom of lower round plate is
about 20

3

4

inches (52.7 cm) above implement

frame. Turn inlet tube toward center of implement.

Wing Tower Installation

Refer to Figure 28 and Figure 28 on page 22
4.

Loosen 2

1

2

×2

1

2

inch U-bolts

that hold tower on

support bracket.

5.

Reposition tower so bottom of lower round plate is
about 25 inches (63.5 cm) above implement frame.
Turn inlet tube along the rear frame tube and toward
center of implement.

6.

After towers have been installed and before any
seed hoses are installed, slowly fold implement while
watching to be sure there is no interference.

Refer to CTA4000 or CTA4000HD Operator’s Manual
for fold and unfold instructions.

7.

If a tower interferes with any part of implement,
completely reposition tower. Repeat these steps until
implement can be folded without tower interference.

Figure 27

Position Center Tower

16198

ROTA

TE T

OW

ARD

CENTER OF DRILL

20¾in (52.7cm)

P

Figure 28

Position Wing Tower (Left Shown)

29338

25in (63.5cm)

25in (63.5cm)

ROTA

TE ALONG REAR

ROTA

TE ALONG REAR

FRAME TUBE T

OW

ARD

FRAME

TUBE

TOW

ARD

DRILL CENTER

DRILL CENTER

U

D

B

F

R

L

P

Advertising
This manual is related to the following products: