Leveling sprayer, Leveling boom, Electrical connections – Great Plains 3P300 Operator Manual User Manual

Page 17

Advertising
background image

Great Plains Manufacturing, Inc.

Preparation and Setup

13

09/14/2009

500-103M-A

Refer to Figure 3
1.

Determine the pin and spacer orientation needed for
the tractor, and securely fasten the hitch pins.

2.

Mount the Three-Point Sprayer to a tractor with the
correct pin mountings determined from instruction
step 1. Make sure that the sprayer frame is level so
that after the boom is assembled, it won’t hit the trac-
tor cab when the boom is folded or raised.

IMPORTANT !

The category 4 narrow hitch (CAT IV-N) spacers are
not standard 3-Point Sprayer parts. Order 501-011S
(Cat IV-N spacers) from a Great Plains dealer.

Leveling Sprayer

Be sure that the top 3-Point link is adjusted correctly so
that the frame is level in operating position but will not hit
the cab in transport. The tractor 3-Point arms should be
adjusted to keep the sprayer level from side to side with
lift arm rigid.

Leveling Boom

See Boom Operator manual for boom leveling instruc-
tions.

Electrical Connections

For a new sprayer (or moving to a different tractor), first
complete tractor electrical installation (See “Cab and
Optional Components
” on page 18), and installation of
any sprayer Options not factory- or dealer-installed.

Connection

Comment

❑ Raven Controller Standard (two connectors)
❑ Electro-Hydraulics Optional (two connectors)
❑ Foam Marker

Optional

❑ Radar Sensor

Optional - routine hook-up only if
sensor is sprayer-mounted

Figure 3

Hitch Pins and Spacers

12654

Advertising