Ace pump assembly – Great Plains 3P300 Operator Manual User Manual

Page 52

Advertising
background image

48

3P300 S/N HH1113+

Great Plains Manufacturing, Inc.

500-103M-A

09/14/2009

Ace Pump Assembly

Refer to Figure 30
1.

Install forward internal bearing snap ring

in

mounting frame

.

2.

Press in forward bearing

from rear side of mount-

ing frame

to snap ring

.

3.

Install two external shaft retainer rings

with

spacer

between on shaft

.

4.

Press shaft assembly through forward bearing
until forward shaft snap ring

rests against inner

face of forward bearing

.

5.

Press rear bearing

over shaft

.

6.

Insert rear internal bearing snap ring

.

7.

Slide rubber slinger

over shaft

and push back

to front bearing

.

8.

Clean old sealant from mounting frame seal bore.

9.

Install o-ring

in shaft groove.

10. Apply non-hardening Type 2 Permatex or similar

under stationary seal flange.

11. Place stationary portion of seal

over shaft

and

press into seal bore cavity. Use a 1

3

8

in ID pipe or

PTO adapter to press seal flange evenly on all sides.

12. Install rotating portion of seal

over shaft

and o-

ring

by hand. The two polished seal faces should

face each other. Avoid contacting polished seal
faces.

13. Insert key

in keyway

and install impeller

on

shaft

.

14. Place lock washer

and

3

8

in lock nut

on shaft

and tighten nut

.

15. Replace volute o-ring or gasket

, volute

, and

four

3

8

in x

3

4

in cap screws

.

16. Position coupler in pump shaft slot and fill cavity sur-

rounding coupler with grease.

17. Install motor

by aligning motor tang and coupler

slot. Rotate motor

until nameplate faces up.

18. Install four

5

16

in cap screws

.

Figure 30

Ace Hydraulic Pump

23373

11

8

12

8

11

13

14

16

12

13

12

12

16

11

10

16

12

20

17

16

6

16

20

15

5

5

16

4

3

16

3

7

2

9

18

18

19

Advertising