Connect sequence hoses to base, Connect sequence hoses to rod, Route hoses to sequence valve – Great Plains 2525P Assembly Instructions User Manual

Page 10: Connect cylinder hoses at sequence valve

Advertising
background image

10

Great Plains Manufacturing, Inc.

Front Page

Appendix

25-Foot Marker Option

113-786M

Front Page

Appendix

2013-09-05

Connect Sequence Hoses to Base

Refer to Figure 15
37. Select two new:

811-297C SP HH1/4R1 212 3/8MNPT-W/AD

These are the shorter NPT hoses.

Apply liquid pipe thread sealant to the MNPT
threads. Connect the

3

8

inch NPT end of each hose

to a cylinder base end elbow

.

38. Select two new (not shown):

800-300C CABLE TIE 2 DIA MIN - ORG

Secure one tie to the

1

2

inch MNPT end of a each

base end hose

, near the NPT fitting. This

identifies the base hoses for later connection.

Connect Sequence Hoses to Rod

Refer to Figure 15
39. Select two new:

811-129C HH1/4R1 234 3/8MNPT 1/2MNPT

These are the longer NPT hoses.

Apply liquid pipe thread sealant to the MNPT
threads.Connect the

3

8

inch NPT end of each hose

to a cylinder rod end elbow

.

Route Hoses to Sequence Valve

40. Select twelve new (not shown, 6 each side):

800-082C CABLE TIE .31X21.5 6DIA 120LB

41. Route the hoses along the top of the upper tool bar,

through the cutout in the gusset of the transport
carrier mount. Loosely secure with cable ties. Ties
are tightened at “Close-Out” on page 18.

Connect Cylinder Hoses at Sequence Valve

Refer to Figure 15
42. Connect the left hand base end hose (

, with

orange tie) to the fittings at sequence valve port R1.

43. Connect the right hand base end hose (

, with

orange tie) to the fittings at sequence valve port R2.

44. Connect the left hand rod end hose

to the fittings

at sequence valve port C1.

45. Connect the right hand rod end hose

to the

fittings at sequence valve port C2.

C1

84

85

82

R1

84

Figure 15

Sequence Hoses to Cylinder

36028

85

84

42

85

82

84

41

85

85

82

82

Advertising