Install right cylinder hoses – Great Plains NTA2007HD Assembly Instructions User Manual
Page 10

10
2013- Single Fold Marker
Great Plains Mfg., Inc.
113-850M
2013-10-10
Install Right Cylinder Hoses
Refer to Figure 13
54. Select two hoses:
HP-9JF154
3/8" HOSE X 154" 9/16 JICF ENDS
One with orange tie or “R” tag, and one without.
55. Connect one end of the hose with the orange/R
marking to sequence valve port R.
56. Connect the unmarked hose to sequence valve
port C
57. Route the hoses under the clamp
face of the wing lock lug. Leave clamps lightly snug
at this time, to allow for sag and slack adjustment at
step 61.
58. Route the hoses under the clamp
near the fold cylinder rod end.
59. Route the hoses to the front of the wing, under the
adjustment valve assembly and under the outer
wing clamp
.
60. At the cylinder, connect the orange/R hose to the
elbow fitting
at the rod end.
Connect the unmarked hose to the elbow at the
base end
61. Adjust hose sag and slack:
62. Tighten all clamps.
Null4:
• Allow just enough sag at the wing pivot so that
the hose is near, but no lower than the wing
pivot pin.
• Where the hoses naturally cross each other
at
the cylinder, secure a cable tie.
• Add a second tie approximately 40cm (16in)
away, to bundle the hoses.
• Create enough slack at this location for a loop no
higher than the spring holder
on the marker.
The rod end hose must follow the rod end of the
cylinder as it swings out and toward the rear dur-
ing marker extension.
• Balance remaining slack at the adjustment valves
and at the sequence valve.
Check that all slack is clear of moving parts.
Null4:
Figure 13
Right Cylinder Hose Routing
31346
R
C
1
73
3
2
5
4
6
73
1
2