Install supply hoses – Great Plains NTA2007HD Assembly Instructions User Manual

Page 11

Advertising
background image

Great Plains Mfg., Inc.

Front

Parts

Installation Instructions

11

2013-10-10

Front

Parts

113-850M

Install Supply Hoses

Refer to Figure 14
63. Select two new:

HP-9JF100.375

3/8" HOSE X 100" 9/16 JICF ENDS

As prepared at step 40 through step 43.

64. Connect the FJIC ends of the hoses to the MJIC

ports on the bottom of the sequence valve

.

65. Route the hoses through the hose clamp

mounted upper the right side of the top hitch tool
bar. Leave clamps lightly snug at this time, to allow
for sag and slack adjustment at step 69.

Null4:

Refer to Figure 15
66. Route the left hose

through the mid-hitch

clamp

, which may have only one available clamp-

ing location.

67. Use a tie wrap to loosely secure the right hose

to

the left hose near the mid clamp.

68. Route both hoses through the front clamp

.

69. Adjust sag and slack:

70. Tighten all clamps.

Null4:

Null4:

Figure 14

Valve to Hitch Hose Routing

31347

72

1

74

72

74

1

Allow enough slack near the sequence valve to

allow hose disconnection.

allow most of the slack between the top and

mid clamps. The distance between them
increases during lift.

Allow only enough slack between the mid and

front clamps to prevent hose kinking.

Allow enough slack at the QD end of the hoses

to allow easy disconnection. If the implement is
lowered during marker assembly, there will be
ample slack for the small change in distance from
the front clamp to the panel outlet during raise/
lower.

Check that all slack is clear of moving parts.

Null4:

Figure 15

Lower Hitch Hose Routing

31348

U

D

F

B

L

R

3

2

4

5

72

a

b

c

d

2

3

4

5

a

b

c

d

Advertising