Install cylinder hoses, Install left cylinder hoses, Left sag and slack – Great Plains NTA2007HD Assembly Instructions User Manual

Page 9

Advertising
background image

Great Plains Mfg., Inc.

Front

Parts

Installation Instructions

9

2013-10-10

Front

Parts

113-850M

Install Cylinder Hoses

Install Left Cylinder Hoses

Refer to Figure 12 (a composite image)
45. Select two hoses:

HP-9JF154

3/8" HOSE X 154" 9/16 JICF ENDS

One with orange tie or “R” tag, and one without.

46. Connect one end of the hose with the orange/R

marking to sequence valve port R.

47. Connect the unmarked hose to sequence valve

port C

48. Route the hoses under the clamp

on the rear

face of the wing lock lug. Leave clamps lightly snug
at this time, to allow for sag and slack adjustment at
step 52.

49. Route the hoses under the clamp

at mid-wing

near the fold cylinder rod end.

50. Route the hoses to the front of the wing, under the

adjustment valve assembly and under the outer
wing clamp

.

51. At the cylinder, connect the orange/R hose to the

elbow fitting

at the rod end.

Connect the unmarked hose to the elbow at the
base end

.

52. Adjust hose sag and slack per suggestions at right.

53. Tighten all clamps.

Null4:

Null4:

Figure 12

Left Cylinder Hose Routing

31345

R

C

1

6

2

3

4

5

7

8

73

Left Sag and Slack:
• Allow just enough sag at the wing pivot so that the

hose is near, but no lower than the wing pivot pin

.

• Where the hoses naturally cross each other

at the

cylinder, secure a cable tie.

• Add a second tie approximately 40cm (16in) away, to

bundle the hoses.

• Create enough slack at this location for a loop no

higher than the eyebolt on the gauge wheel. The rod
end hose must follow the rod end of the cylinder as it
swings out and toward the rear during marker exten-
sion.

• Balance remaining slack at the adjustment valves and

at the sequence valve.

• Check that all slack is clear of moving parts.

6

7

73

1

2

3

4

5

Advertising