Section 1 Assembly and Setup

Model 2250 Air Drill Implement 160-192M

5/11/05

Great Plains Mfg., Inc.

Frame Locations

Figure 1-1

15379

With the shipping stands still bolted to each frame section,
use the hoist or forklift to move frame sections three (#3) and
four (#4) to center of assembly area, refer to Figure 1-1 and
Figure 1-2. Align flanges (#1) on each frame section and
bolt together using 3/4” x 2 3/4” bolts (#6), 3/4” lock wash-
ers (#7), and 3/4” hex nuts (#8). Attach a flex-limiter strap
(#2) to each side of cylinder lugs (#5) using a 1” x 3 1/2”
bolt (#6).

Refer to Figure 1-3:
With the shipping stands still bolted to each frame section,
move frame section two (#2) so that the pivot bushing end
is aligned with the clevis end of frame section three (#3).
Be sure frame section two is not confused with frame sec-
tion five. This can be avoided by making sure the fold
tubes (#1) are aligned before the frame sections are
joined.

Frame Sections #3 and #4 Assembly

Figure 1-2

15108

Frame Sections #2 & #3,

and #4 & #5 Assembly

Figure 1-3

15109