1" secondary distribution hoses, Danger – Great Plains ADI445 Operator Manual User Manual

Page 28

Advertising
background image

26

Section 1 Assembly and Setup

Model 2250 Air Drill Implement 160-192M

5/11/05

Great Plains Mfg., Inc.

1" Secondary Distribution Hoses

With the implement configuration in mind, refer to the ap-
propriate hose routing illustration for the correct assembly
of hoses, Figure 1-21 and Figure 1-22.

1.

Loosen bolts holding tower halves together, refer to
Figure 1-23.

Do not remove bolts.

2.

Attach the end of the hose to the opener (or coulter
fertilizer tube).

!

DANGER!

To avoid serious injury or death from crushing, make sure cyl-
inder locks channels are in place, implement is sufficiently
blocked up, and tractor is shut off with the key removed before
attempting to route hoses to openers.

NOTE: Seed hoses must be routed to prevent them
from rubbing on sharp edges or being damaged
when the implement is raised, lowered, folded, or un-
folded. Hoses must be pushed fully into distribution
tower ports until they are seated against the stop.

Tower Assembly

Figure 1-23

14449

3.

To avoid serious injury or death from crushing, make
sure cylinder lock channels are in place, implement is
sufficiently blocked up, and the tractor is shut off with
the key removed before attempting to route hoses to
openers.

For floating hoe openers, slide the clamp over the end
of the hose approximately 6”. Put the end of the hose
in the seed tube approximately 6”. Hook the clamp
ends in the holes at the top of the seed tube,
see Figure 1-24.

For coulters with fertilizer attachments, Figure 1-25, attach
seed brake (#1) to coulter fertilizer tube (#2) using provided
hose clamp (#3). Make sure plastic tube (#4) is placed over
fertilizer tube. Connect 1” seed hose (#5) to other end of
seed brake using hose clamp (#3).

Floating Hoe Hose Attachment

Figure 1-24

14563

Advertising
This manual is related to the following products: